Record the route from the carrier’s approach to the installation point for each packed module. At a mountain site, ask the carrier and plant to confirm the actual approach conditions, gradient, seasonal restrictions and available manoeuvring space. Measure the real route rather than relying on building plans alone.
Copy a route sheet for the site visit
| Location | Record | Who confirms |
|---|---|---|
| Road approach, Zufahrt | Approach, verified gradient and date restrictions | Carrier and site |
| Staging yard, Rangierfläche | Measured approach, available working space and access windows | Site logistics and handling provider |
| Inner route, Einbringweg | Actual doors, turns and overhead obstructions | Site engineering with qualified handling team |
| Installation point | Module orientation and service space after placement | Installer and plant |
If the yard and door are confirmed but the carrier has not checked the sloping approach at the intended date, keep delivery provisional and agree the last date for a route decision.
Attach packed dimensions, documented gross mass and dated photos. Give unresolved route sections an owner before confirming the delivery window or the quotation.
The Austrian guide to delivery and restarting connects the access review with the equipment acceptance plan.