Check storage before reserving a seasonal bottling slot. Put finished pallets, approved staging space and scheduled pickups on the same timeline. Use collection windows confirmed by the carrier and distinguish staged, held and saleable pallets.
Work through a delayed pickup
| Event | Planned balance | If Friday pickup slips |
|---|---|---|
| Friday opening | 24 pallets | 24 pallets |
| Friday production | +18, then −24 scheduled for pickup = 18 | +18 without pickup = 42 |
| Saturday production before any pickup | +18 gives 36 | +18 would give 60, 12 over the limit |
| Decision | Proceed within the confirmed space | With just 6 places free, limit production or confirm earlier pickup |
In the delayed scenario, six spaces remain before new production. Confirm approved reserve storage, carrier access and the priority order before assigning more production. Include the saleable-package rate and real pallet pattern.
Use the Austrian equipment selection guide to incorporate available inventory and site constraints in the expected line output.